Project:
Non-Structural Performance Category 3 Upgrades
Location:
San Diego, California
Owner:
UCSD
Architect:
GKK
Project awarded:
August 2007
Completion date:
June 2009.
Project Elements:
NPC-3 Seismic Retrofit of all ceilings, piping greater than 2 -1/2” in diameter and critical equipment. The work was performed in critical areas such as Central Sterile, OR’s, Radiology, Laboratory, Pharmacy, Cath Lab, MRI and Central Supply. All the work was completed without interrupting ongoing hospital operations in the affected areas.
| ETC Makes Five Key Hires ETC Makes Five Key Hires California-based construction/architecture firm specializing in healthcare/biotech & seismic retrofit hires five seasoned architects and construction experts to support [ ... ] |
| USGS ETC gets USGS Earthquake-Ready
|
| University of California San Diego Medical Center University of California San Diego Medical Center January 26, 2010 Role of Planner is Critical in Successful Hospital Seismic Mitigation Seismically retrofitting a hospital in California—mandated [ ... ] |
| Rady Children’s Hospital San Diego Rady Children’s Hospital San Diego Nov. 10, 2009 Seismic retrofitting requires specialists who self-perform Rady Children's Hospital San Diego Suggests Key Selection Criteria Neonatal Inte [ ... ] |
| San Ramon Regional Medical Center San Ramon Regional Medical Center: Dec. 4, 2009 Deadline Approaches for California Seismic Rehab Compliance San Ramon Regional Medical Center, One of the First to Comply, Explains How The clock [ ... ] |
| Other Articles |
© 2011 ETC Building & Design Healthcare Architecture and Construction | Earthquake Simulator | Seismic Mitigation | Earthquake Kits | Site Map | ETC Connect